NOZZLES/VANES
| Siemens Westinghouse | GE |
| W52 | Frame 3 |
| W101 | Frame 5 A-P |
| W191 | Frame 6 A-B |
| W251A-B12 | Frame 7 B-FA |
| W301 | PSM |
| W501A-FD | PSM501FC/FD |
Receive, disassemble, strip coating, inspect, weld repair, braze repair, fixture check, correct downstream deflection, EDM cooling holes, install coupons, coat airfoils, assemble sheet metal details, flow check. TRS has performed leading and trailing edge coupons on both W501F Row 1 and Row 2 Vanes that are in service today.







